KAS Scaffolding Limited partnered with Auburn Group to deliver a critical access scaffolding package for a state-of-the-art Year 5 & 6 teaching block. 


Embracing Modern Methods of Construction (MMC), this fast-track educational project required precision infrastructure to support off-site manufacturing and modular assembly. 


Working in tandem with other trades, KAS Scaffolding delivered a comprehensive perimeter scaffold designed specifically to facilitate the seamless integration of prefabricated OSKOP panels.

Accelerated Timelines and Off-Site Modular Integration

The primary logistical challenge on this modular build was the highly accelerated construction programme inherent to MMC projects. With the rapid completion of drainage systems, attenuation tanks, and crane pad installations, the site operated on strict, just-in-time delivery schedules. 


KAS Scaffolding was required to erect the entire perimeter structure within an exceptionally tight timeframe to prevent bottlenecks. Furthermore, the scaffolding design had to flawlessly accommodate a newly erected tower crane and provide exact structural tolerances to support the crane-assisted installation of the off-site OSKOP panels without impeding the rapid modular assembly sequence.

Accelerated Timelines and Off-Site Modular Integration
Agile Deployment for Modern Methods of Construction (MMC)

Agile Deployment for Modern Methods of Construction (MMC)

Demonstrating exceptional agility and specialist expertise in the modular construction sector, KAS Scaffolding successfully delivered the complete scaffold package well within the accelerated deadline. 


By collaborating closely with Auburn Group and specialist lifting contractors, the KAS team ensured the access structures perfectly aligned with the rigorous spatial demands of off-site manufacturing assembly. 

This rapid, reliable deployment provided a safe, compliant working platform that allowed the OSKOP modular panels to be installed seamlessly, keeping this first-class MMC educational facility firmly on track and showcasing KAS’s proven capability to support modern, fast-paced modular builds.

Work with us

Your Scaffolding Project
Starts Here

Trusted by

Bauvill
VolkerLaser
Navigator
Barnes Construction
DS Smith
EMR
Fortis Vision
Bryen Langley
Eurovia
Thomas Sinden

By submitting your details, you agree for one of our team to contact you.