Marine Pier Refurbishment Access - River Thames - Essex

Engineered Access Scaffolding

Project

Marine Pier Refurbishment Access - River Thames - Essex

29 October 2026

Engineered Access Scaffolding

Engineered Access Scaffolding

KAS Scaffolding Limited was appointed to deliver a complex access scaffolding package at the Navigator Terminals site. 

The comprehensive scope of works required the installation of Designed System (Layher) Scaffold Structures to 12 piers. Utilising advanced Layher System Scaffolding, the project necessitated a robust, highly engineered solution to provide safe and reliable access over water.

Over-Water Logistics and Strict Programmme Deadlines

The primary operational challenge at Navigator Terminals was the requirement to construct safe, stable scaffolding directly over water to access the 12 marine piers. 

Working in a demanding marine environment introduces significant logistical hurdles, including complex material handling over open water and strict environmental containment. Furthermore, the project was governed by a tight programme of works starting in September 2022. 

This dictated that the complex Layher systems had to be deployed flawlessly and at pace, as any delays in erecting the over-water structures would heavily impact VolkerLaser's broader construction operations.

Over-Water Logistics and Strict Programmme Deadlines
Layher System Integration and Engineered Marine Design

Layher System Integration and Engineered Marine Design

To overcome the complexities of the marine environment, KAS Scaffolding implemented a bespoke engineering solution specifically tailored for over-water access. 

The deployment of Layher System Scaffolding was critical to this success, offering superior structural integrity, rapid assembly capabilities, and the adaptability required to navigate the 12 piers safely and efficiently. 

By working to the exact specifications and design drawings formally incorporated into the sub-contract, KAS ensured that the demanding project deadlines were achieved. This highly engineered approach provided VolkerLaser with a compliant, safe working platform, delivered on time despite the highly challenging over-water conditions.

Work with us

Your Scaffolding Project
Starts Here

Trusted by

Bauvill
VolkerLaser
Navigator
Barnes Construction
DS Smith
EMR
Fortis Vision
Bryen Langley
Eurovia
Thomas Sinden

By submitting your details, you agree for one of our team to contact you.